
The rules
Bigger systems, clearer rules
The general binding rules set limits of 2 cubic metres a day to the ground and 5 cubic metres a day to surface water, and they cover domestic-type sewage only.
Above those limits, or for trade effluent, you'll usually need an environmental permit or a sewer connection. We check volumes and options at the assessment so there are no surprises later. The rules explained